Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Apr 01, 2023     29-10 New Landing Gear Service Bulletin SB00007 - (5 hours)       Category: Landing Gear
Almost done with the SB00007 Service Bulletin (changing Gear Leg Mounts).
Lucio did again most of the work with my assistance. We inserted all the bolts starting from the AN5 in the onboard corner....and then slowly moving into the different sides and bolt sizes. We needed some lubricant but finally we have been able to insert all the bolts. A little help from the rivet gun at very very low pressure for one AN4 at the bottom...very unfortunate location, but at the end even that one went in. I torqued all the AN3, but for the AN4 i need to wait for a bigger torque wrench as mine goes up only to 46lbs/in.
As the SB00007 indicates to use selflocking metal bolts (MS21042-3/4/5) i torqued the AN3 to 28+14 (friction)=42 lbs/in. I need to wait for a bigger torque wrench for the others.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.